DBPR license data as of · last refreshed · How we build this
Critical Path Construction, LLC
Certified Roofing Contractor License CCC1333187 Riviera Beach, FL
Critical Path Construction, LLC holds Florida certified roofing license CCC1333187, current and active in DBPR's public license file dated November 17, 2026. First licensed June 17, 2021 (5 years ago); expires August 31, 2028. CILB discipline files (FY 2021/22 to FY 2025/26): no entries found. Verify the license with DBPR before hiring.
License details
- License number
- CCC1333187
- License type
- Certified Roofing Contractor
- Status (as of file date)
- Current, Active
- Business name (DBA)
- Critical Path Construction, LLC
- Licensee of record
- Wil Hicks
- Original license date
- June 17, 2021
- License expires
- August 31, 2028
- City (address of record)
- Riviera Beach, FL
- County
- Palm Beach County
- Where they may work
- Statewide: a certified contractor may contract in any Florida jurisdiction. (Fla. Stat. § 489.105(8), (10))
Phone, website and service area aren't shown because they aren't part of the public license record. The owner can add them by claiming this listing.
Board discipline records (public record)
No entries for license CCC1333187 were found in the Construction Industry Licensing Board (CILB) licensed-contractor and Recovery Fund discipline files DBPR publishes for FY 2021/22 to FY 2025/26. DBPR public records.
No entry in these files does not mean no history: older actions, open complaints and unlicensed-activity cases without a license number aren't included. Codes and wording are DBPR's; we don't interpret them. Matched by exact license type and number (see methodology).
Dispute or respond: if you are this licensee and think our copy is wrong, or want to respond, email Jacob@campfirecreativemedia.com. We fix errors in our copy, but DBPR's records can only be changed through DBPR. Our copy is refreshed from DBPR's published files, so cases DBPR closes or removes drop off at our next refresh.
Report a problem with this listing (wrong details, a fake or unauthorized claim, or a removal request)
How to verify a Florida roofing license
- Open the official DBPR license search: myfloridalicense.com/portalsearches/VerifyLicensee.
- Search by license number (CCC1333187) or by name.
- Confirm the license type is roofing, the status is current and active, and the name matches the company on your contract.
- Questions? DBPR's Customer Contact Center is listed at 850.487.1395.
This directory is built from a copy of DBPR's public data file, so DBPR's official search is always the most current source.
Request a roofing quote
Tell us about your project (you're on Critical Path Construction, LLC's listing). We'll receive and save your request for our team to review. Requests aren't sent to roofers automatically yet, so no roofer is guaranteed to contact you. You can always contact a licensed roofer directly.
Claim this listing
Add your phone, website, services and photos. Every claim is checked against DBPR license records and reviewed by hand before anything appears on the site.
Other licensed roofers in Riviera Beach
Nearby
- Roofers in Lake Park
- Roofers in North Palm Beach
- Roofers in West Palm Beach
- Roofers in Palm Beach
- Palm Beach County roofers
CCC vs RC: what this license type means · How to verify a Florida roofing license
Questions about Florida roofing licenses
How do I check if a Florida roofer is licensed?
Search the license number or name on DBPR's official Verify a Licensee page. Confirm it is a roofing license (CCC or RC), the status is Current and Active, and the name matches your contract. Source: DBPR Verify a Licensee, checked 2026-11-18
What is the difference between a CCC and an RC roofing license?
A certified roofing contractor (CCC) may contract in any Florida jurisdiction. A registered roofing contractor (RC) met a local jurisdiction's competency requirements and may contract only in the jurisdictions where the registration was issued. Source: Fla. Stat. § 489.105(8), (10), checked 2026-11-18
Can a general contractor do my roof?
Only if it also holds a roofing certificate or registration. Otherwise it must subcontract roofing, except shingle roofing on a new building of its own construction. Source: Fla. Stat. § 489.113(3), checked 2026-11-18
What is the Florida Homeowners' Construction Recovery Fund?
A fund that may pay, up to a limited amount, if you lose money on a project because a licensed contractor violated specified Florida laws. Residential contracts over $2,500 must include a notice about it. Source: Fla. Stat. § 489.1425(1), checked 2026-11-18
What do DBPR license status codes mean?
Primary status: C = Current, P = Probation, S = Suspended. Secondary status: A = Active, I = Inactive. Look for Current, Active. Source: DBPR, Understanding DBPR Codes, checked 2026-11-18
Where can I see if a roofer has been disciplined?
DBPR publishes Construction Industry Licensing Board discipline files (licensed contractor, unlicensed activity and Recovery Fund) by fiscal year on its Construction Industry public records page, currently FY 2021/22 to FY 2025/26. Source: DBPR Construction Industry Public Records, checked 2026-11-18
General information from official sources, not legal advice.
Listings come from public license records published by the Florida Department of Business and Professional Regulation (DBPR public records), file dated November 17, 2026. City and county reflect each licensee's address of record, not necessarily their service area. A listing is not an endorsement, and this site is not affiliated with DBPR. Always verify a license with DBPR before hiring.